Scada Electricity

With the increasing density of the Kanpur city and its industrialization the need to automate and enhance the existing electiricty distribution management functions has become paramount. KSCL put in place tagging and switch order management. It provides NEW capabilities for distribution systems such as real-time awareness; complete 3-phase powere flow calculation-based network analysis to manage voltage and thermal limits and provide fault location, isolation and system restoration; network optimization tools for minimizing system losses and reducing peak load; outage management tools for reducing outage time and increasing crew safety for planned and unplanned outages.

Project Start Date: 15-02-2020
Project Completion Date: 25-03-2022
Project Cost - 44.00 cr.
tourist_places_image
tourist_places_image
tourist_places_image
tourist_places_image
tourist_places_image
tourist_places_image
tourist_places_image
tourist_places_image
tourist_places_image
tourist_places_image

IMPORTANT LINKS

heading_bottom_line